Optimizing rainwater detection and retention is essential. This not only prevents flooding but also enables efficient water storage through sustainable technical solutions.
Products used
Geotextile
Drainage Boxes and Cells
Geomembranes
Geotextile
Drainage Boxes and Cells
Geomembranes
Application sectors
Mining
Hydrocarbons
Urban Development
Sanitation
Mining
Hydrocarbons
Urban Development
Sanitation
Mining
Hydrocarbons
Urban Development
Sanitation
Some projects completed
Ciega Basins, Piura, Peru
Ciega Basins, Piura, Peru
Ciega Basins, Piura, Peru
In urban areas of Piura with high vulnerability to pluvial flooding, a storage system with a regulation capacity of between 1,200 and 3,000 m³ was implemented, designed to mitigate the risk of flooding during intense rainfall events.
As part of the system, drainage boxes encapsulated with 400 g/m² geotextile, 1.5 mm HDPE geomembrane, and a second layer of geotextile of the same weight were installed, serving as protection and waterproofing. In addition, prefabricated settling tanks and pumping chambers were incorporated, optimizing system operation and facilitating on-site connections with greater technical and construction efficiency.
Ciega Basins, Piura, Peru
In urban areas of Piura with high vulnerability to pluvial flooding, a storage system with a regulation capacity of between 1,200 and 3,000 m³ was implemented, designed to mitigate the risk of flooding during intense rainfall events.
As part of the system, drainage boxes encapsulated with 400 g/m² geotextile, 1.5 mm HDPE geomembrane, and a second layer of geotextile of the same weight were installed, serving as protection and waterproofing. In addition, prefabricated settling tanks and pumping chambers were incorporated, optimizing system operation and facilitating on-site connections with greater technical and construction efficiency.
Need advice?
Our team of experts is ready to advise you and help you find the best option for your project.
Success stories
Leaching pads – Geomembranes – La Libertad, Peru.
The waterproofing of the Lagunas Norte leach pad has completed Phase 2, a project TDM has been carrying out since Phase 0. The total ore volume at the end of...
We were at Arminera, one of the most important events in the Argentine mining sector, presenting our engineering solutions with geosynthetics, applied to the main challenges of mining projects. We...
The waterproofing of the Lagunas Norte leach pad has completed Phase 2, a project TDM has been carrying out since Phase 0. The total ore volume at the end of...
We were at Arminera, one of the most important events in the Argentine mining sector, presenting our engineering solutions with geosynthetics, applied to the main challenges of mining projects. We...