Hydraulic solution consisting of stairways and energy dissipating cubes designed to reduce water energy at the outlets of cross-drainage culverts in roads and canals. This structure reduces flow velocity, effectively controls erosion, and protects adjacent structures, improving the stability and functionality of the drainage system in critical areas.
Products used
Geocells
Geocells
Application sectors
Roads
Urban Development
Mining
Agriculture
Roads
Urban Development
Mining
Agriculture
Roads
Urban Development
Mining
Agriculture
Some projects completed
Mining Unit, Ancash, Peru
Mining Unit, Ancash, Peru
Mining Unit, Ancash, Peru
In response to the high gradients and velocities present in the project’s canals, specific hydraulic structures were designed that incorporated geocell linings and energy dissipating cubes. This solution significantly reduced the use of steel in the lining and the need for joints between concrete slabs, optimizing both construction time and resources.
Most significant was this solution’s ability to control high-energy water flows, effectively mitigating the erosive effects on slopes and preventing damage to surrounding infrastructure and the natural environment. This ensured safe, sustainable, and highly durable hydraulic operation under extreme conditions.
Mining Unit, Ancash, Peru
In response to the high gradients and velocities present in the project’s canals, specific hydraulic structures were designed that incorporated geocell linings and energy dissipating cubes. This solution significantly reduced the use of steel in the lining and the need for joints between concrete slabs, optimizing both construction time and resources.
Most significant was this solution’s ability to control high-energy water flows, effectively mitigating the erosive effects on slopes and preventing damage to surrounding infrastructure and the natural environment. This ensured safe, sustainable, and highly durable hydraulic operation under extreme conditions.
Need advice?
Our team of experts is ready to advise you and help you find the best option for your project.
Success stories
Leaching pads – Geomembranes – La Libertad, Peru.
The waterproofing of the Lagunas Norte leach pad has completed Phase 2, a project TDM has been carrying out since Phase 0. The total ore volume at the end of...
We were at Arminera, one of the most important events in the Argentine mining sector, presenting our engineering solutions with geosynthetics, applied to the main challenges of mining projects. We...
The waterproofing of the Lagunas Norte leach pad has completed Phase 2, a project TDM has been carrying out since Phase 0. The total ore volume at the end of...
We were at Arminera, one of the most important events in the Argentine mining sector, presenting our engineering solutions with geosynthetics, applied to the main challenges of mining projects. We...