Corrugated steel structures provide a robust and lightweight solution, combining the durability of galvanized steel with an optimized structural design that achieves maximum stiffness with minimal weight.
Manufactured using corrugated plates with specialized geometry, these structures offer excellent rigidity and adaptability to a wide range of project requirements, significantly reducing installation time and costs, as well as long-term maintenance expenses.
They represent a versatile and efficient alternative for bridge replacement, grade separations, and other roadway infrastructure solutions.
Advantages / Benefits
Lightweight: Excellent strength-to-weight ratio.
Time savings on projects: Fast and efficient construction process.
Durability and high performance: Enhanced corrosion protection.
Functional versatility: Adaptability to diverse environments and engineering challenges.
Applications
Large-span metal structures
Application sectors
Roads
Urban development
Mining
Roads
Urban development
Mining
Roads
Urban development
Mining
Application sectors
Bypass – La Arena Mine, Trujillo, Peru
Chilloroya River Crossing - Constancia Mine, Cusco, Peru
Bypass – La Arena Mine, Trujillo, Peru
Chilloroya River Crossing - Constancia Mine, Cusco, Peru
Bypass – La Arena Mine, Trujillo, Peru
Within the production process of the La Arena Mine, it was necessary to transport extracted material from the pit to the processing plant, crossing the Trujillo–Huamachuco highway at kilometer 163. To ensure operational continuity and road safety, a grade-separated crossing was designed to isolate heavy mining traffic from public vehicular flow.
The adopted solution consisted of installing a structural arch with a span of 13.885 meters and a rise of 9.482 meters. The TDM Group supplied the structure and provided comprehensive on-site technical support, overseeing the assembly process and the correct placement of the structural backfill.
This intervention enabled efficient integration between mining operations and existing roadway infrastructure, ensuring durability and functionality under demanding conditions.
Chilloroya River Crossing - Constancia Mine, Cusco, Peru
To enable a safe and efficient vehicular crossing over the Chilloroya River at the Constancia mining operation in Cusco, a structural solution capable of supporting heavy-duty mining vehicles was developed. The design met operational requirements while maintaining year-round functionality and minimizing impacts on the hydraulic environment.
The installed structure featured a 9.00-meter diameter with beveled ends, optimized to withstand high loads and ensure proper hydraulic performance.
The TDM Group was responsible for the supply and turnkey installation of the system, delivering an efficient installation and a highly durable solution aligned with the requirements of critical mining infrastructure.
Bypass – La Arena Mine, Trujillo, Peru
Within the production process of the La Arena Mine, it was necessary to transport extracted material from the pit to the processing plant, crossing the Trujillo–Huamachuco highway at kilometer 163. To ensure operational continuity and road safety, a grade-separated crossing was designed to isolate heavy mining traffic from public vehicular flow.
The adopted solution consisted of installing a structural arch with a span of 13.885 meters and a rise of 9.482 meters. The TDM Group supplied the structure and provided comprehensive on-site technical support, overseeing the assembly process and the correct placement of the structural backfill.
This intervention enabled efficient integration between mining operations and existing roadway infrastructure, ensuring durability and functionality under demanding conditions.
Chilloroya River Crossing - Constancia Mine, Cusco, Peru
To enable a safe and efficient vehicular crossing over the Chilloroya River at the Constancia mining operation in Cusco, a structural solution capable of supporting heavy-duty mining vehicles was developed. The design met operational requirements while maintaining year-round functionality and minimizing impacts on the hydraulic environment.
The installed structure featured a 9.00-meter diameter with beveled ends, optimized to withstand high loads and ensure proper hydraulic performance.
The TDM Group was responsible for the supply and turnkey installation of the system, delivering an efficient installation and a highly durable solution aligned with the requirements of critical mining infrastructure.
Need advice?
Our team of experts is ready to advise you and help you find the best option for your project.
Success stories
Dynamic Barriers Against Debris Flows – Chosica, Lima, Peru
stability and containment
The Problem In recent years, the district of Chosica in Lima has been affected by debris flows (huaicos) generated in its ravines. In 2015 alone, nine fatalities were reported, 341...
We have partnered with Rival + Tubos + in Ecuador to drive the infrastructure of the future!
GeosyntheticsLATAM
At Grupo TDM, we are proud to serve as the official supplier of geomembranes (HDPE and LLDPE), extruded geogrids, and geocells for Rival Tubos. This strategic alliance enables us to...
Dynamic Barriers Against Debris Flows – Chosica, Lima, Peru
stability and containment
The Problem In recent years, the district of Chosica in Lima has been affected by debris flows (huaicos) generated in its ravines. In 2015 alone, nine fatalities were reported, 341...
We have partnered with Rival + Tubos + in Ecuador to drive the infrastructure of the future!
GeosyntheticsLATAM
At Grupo TDM, we are proud to serve as the official supplier of geomembranes (HDPE and LLDPE), extruded geogrids, and geocells for Rival Tubos. This strategic alliance enables us to...