CONTACTO
Screen Width: px
Breakpoint:
Menu State:
Other solutions

Other solutions

Brochure

Tunnel cladding

Cladding systems with metal and/or composite panels to improve tunnel safety by increasing brightness, ease of cleaning, and passive fire protection.

Products used

Glazed panels

Glazed panels

Glazed panels

Glazed panels

Advantages

Aesthetic, durable, and safe glazed finish
Offers long-lasting color intensity; classified as A1 fire-resistant, without emitting toxic gases.

Improves spatial perception and tunnel safety
Significantly increases interior brightness and creates a sense of spaciousness, preventing claustrophobic or unpleasant feelings.

Uniform visual transition without “black hole” effect
Its homogeneous reflection capacity avoids abrupt light contrasts when entering the tunnel, reducing the risk of accidents due to loss of visibility.

Easy-to-clean glazed surface
The technical enamel allows graffiti removal with solvents without damaging the finish, facilitating maintenance and preserving the aesthetic of the environment.

Application sectors

Roads

Roads

Urban Development

Urban Development

Ports and Airports

Ports and Airports

Roads

Roads

Urban Development

Urban Development

Ports and Airports

Ports and Airports

Roads

Roads

Urban Development

Urban Development

Ports and Airports

Ports and Airports

Some projects completed

Benavides Tunnel Lining, Lima, Peru

Benavides Tunnel Lining, Lima, Peru

Benavides Tunnel Lining, Lima, Peru

Benavides Tunnel Lining, Lima, Peru

Need advice?

Our team of experts is ready to advise you and help you find the best option for your project.








    I have read and accept the privacy policy and data processing terms

    Brochure

    Success stories

    Paving with polymer-modified asphalt mixtures

    Modified asphalts
    THE PROBLEM: The total length of the project (428 km) was divided into the following sub-sections: Quilca District – Arequipa District (Repartición) (121.549 km) Matarani District – Moquegua District (158.234...
    View case

    News

    XXIII Ibero-Latin American Asphalt Congress (CILA)

    Asphalts
    From November 17 to 21, 2025, over five days, key topics were addressed, including the design and maintenance of flexible pavements, asphalt materials, new management models, and solutions that promote...
    View news

    Success stories

    Paving with polymer-modified asphalt mixtures

    Modified asphalts
    THE PROBLEM: The total length of the project (428 km) was divided into the following sub-sections: Quilca District – Arequipa District (Repartición) (121.549 km) Matarani District – Moquegua District (158.234...
    View case

    News

    XXIII Ibero-Latin American Asphalt Congress (CILA)

    Asphalts
    From November 17 to 21, 2025, over five days, key topics were addressed, including the design and maintenance of flexible pavements, asphalt materials, new management models, and solutions that promote...
    View news
    ¿Necesitas ayuda?