Paving at the New Jorge Chávez Airport under FAA Regulations
CasesTHE PROBLEM: The construction of the new runway at Jorge Chávez International Airport demanded the most rigorous engineering standards at...
View case
Modified asphalts
THE PROBLEM:
The Rutas de Lima concessionaire needed to carry out a functional intervention on high-traffic sections of the Panamericana Sur and Norte (approximately 400,000 m²), a road characterized by an extremely high heavy-load vehicle flow. The challenge was to implement a solution that met four critical conditions:
THE SOLUTION:
The Rutas de Lima concessionaire, in strategic partnership with COPAVEL and with the technical support of TDM, conducted an exhaustive study and analysis of different solution alternatives and decided to use a warm ultra-thin asphalt mix as the solution to the functional problem — referred to as hot micropaving — which also meets the requirements of an SMA 8 (Stone Mastic Asphalt) ultra-thin asphalt mix at 1″ thickness. It is important to highlight that this solution used an asphalt binder meeting the PG performance grade required for the project’s climatic and traffic conditions, produced by TDM under the commercial name Betutec 60/85 PG 76-22E warm mix.
The key components of this technical solution were:
BENEFITS:
The ultra-thin asphalt mix (hot micropaving) demonstrated extraordinary performance, equivalent to that of an SMA 8 ultra-thin asphalt mix, ideal for the demands of the Panamericana Sur and Norte, which carry extremely high traffic volumes.
The warm mix technology used in this solution enabled extended transport and waiting times, ensuring the quality and placement of the mix on-site during nighttime work shifts.
Performance test results, as part of the on-site quality control policy, confirm excellent resistance to permanent deformation, reflective cracking, and high skid resistance.
The mix gradation, equivalent to the SMA mix, combined with the modified asphalt designed for the project’s climatic and traffic conditions, ensures a high-performance asphalt mix — one that, after one year of monitoring, continues to deliver outstanding results.
THE PROBLEM: The construction of the new runway at Jorge Chávez International Airport demanded the most rigorous engineering standards at...
View case
THE PROBLEM: The project to improve and expand urban mobility services at the intersection of Av. Ramiro Prialé and Av....
View case
THE PROBLEM: The total project length (428 km) was divided into the following sub-sections: Dv. Quilca – Dv. Arequipa (Repartición)...
View case