Construction of the new Montalvo Bridge
CasesTHE PROBLEM: The Montalvo Bridge Consortium had to carry out the construction of the new Montalvo Bridge following the collapse...
View case
Modified asphalts
THE PROBLEM: The total project length (428 km) was divided into the following sub-sections:
Given the traffic volume this concession would sustain, the conventional asphalt mixture proposed in the initial engineering study did not meet the performance requirements for a long-term beneficial solution. Furthermore, the solution involved placing a 4 cm asphalt layer (thin thickness). The project included sections located at long hauling distances (over 4 hours), which caused the asphalt mixture to cool down, preventing the achievement of the desired compaction densities.
THE SOLUTION: TDM proposed a high-performance solution to the client, offering long-term durability and ensuring concession performance over a longer period. The polymer-modified asphalt combined with next-generation warm mix additives resolved the compaction issues.
BENEFITS:
THE PROBLEM: The Montalvo Bridge Consortium had to carry out the construction of the new Montalvo Bridge following the collapse...
View case
THE PROBLEM: The construction of the new runway at Jorge Chávez International Airport demanded the most rigorous engineering standards at...
View case
THE PROBLEM: The Rutas de Lima concessionaire needed to carry out a functional intervention on high-traffic sections of the Panamericana...
View case